The Tehran Metro Line 4 Maintenance Project is implemented with the goal of ensuring safety, improving service quality, and reducing service disruptions. This project includes rail maintenance and repair, upgrades to signaling and power supply systems, and continuous inspection of equipment. The implementation of this plan plays a key role in increasing efficiency, reducing long-term costs, and enhancing passenger satisfaction, while contributing to the sustainable development of urban transportation.
Monthly Report – Tehran Metro Line 4
You can download and view the report file for this line through the link below.